What is official name of the project?
Capital Smart City (CSC) is the official name of this project located near New Islamabad International Airport.
Why Smart City?
In view of growing housing demand in the twin cities, FDHL intends to build a quality housing project on M2 Motorway near New Islamabad International Airport falling on the eastern route of CPEC. The Region’s All Purpose Hub Located on Motorway (M2) with close access with new Islamabad International Airport and twins Cities. The Home Of Luxury, The center of Now Unmatched Facilities
What is exact location of the project?
Project is located on Motorway (M2) near new Islamabad International Airport.
Is any dedicated access is approved on Motorway?
Yes, a dedicated interchange is approved by the authorities on Motorway (M2) as a main entrance.
What is FDHL?
FDH is one of the leading real estate developers and asset management company operating in Pakistan to develop new state of the art smart cities with a focus not only to give luxury living but also equal economic contributions. Through strategic investments, innovative urban planning and life cycle asset management, FDH creates integrated communities that embody international standards of sustainability with a strong commitment to quality.
What about Surbana Jurong?
Surbana Jurong (SJ), the Singapore based consultancy firm, was the appointed Master Planner for CSCI. Headquartered in Singapore, SJ is presently one of the largest Asia-based urban, industrial and infrastructure consulting firms, providing one- stop consultancy solutions. SJ’s motto ‘Building Cities, Shaping Lives’ reflects its belief to:- – Create spaces and infrastructure services where people live, work and play. – Shaping cities into homes with sustainable jobs where communities and businesses can flourish
Approx. length (Km) of Roads in Housing Project ?
Total roads in housing area 210 km approx. and in Overseas Block only 23.51 km.
What are sizes of roads in the Society?
Minimum size of road is 40 feet. Width of Boulevard is 350 feet wide. Other main roads are 180 feet, 150 feet, 120 feet, 100 feet and 80 feet.
What is % age of Roads of total land?
Roads are about 34.89% of the land.
What are sizes of Sewerage pipes for total length of Sewerage lines in the society?
Length of Sewerage line are from 9 inch to 60 inch of diameter is about 431 km in total area but in overseas 34.50 km.
What is the length of water supply lines in the society?
What is the water source of the project?
Water source is confirmed to WASA and RDA, through an very intensive investigation process called ERS and text bores. We will require about 40 tube wells downstream of Chahan Dam in River Sill.
What is the timeline for complete development of the society?
We will require approx. 5 years time to complete development works of 24,000/- kanal housing area but first 15,000/- kanal area including Overseas Block will require 3 years starting from 20 Jan, 2018. Few mosques, primary schools, clinics and grocery shops will also available within 3 years for people starting their houses after possession. Possession period agreed, committed, confirmed and guaranteed is 3 years for Overseas Block.
How much machinery/equipment is initially deployed for development work at site?
Initially, we have deployed 35 equipment / machines including 10 Bulldozers. These are increasing day by day. In peak time there will be more then 350 machines working, Insha Allah.
How much workforece is initially deployed for development work at site?
Workforce at moment is very less because all works going on is mechanised and no manual works have started yet. At the moment work force is approx. 120 persons. However in peak time it will increase to 5,000 persons per day, which will include machine operators, heavy and light Driver’s, masons, carpenters, steel fixers, carpenters, helpers and labourers.
How many blocks are planned in the societey?
We have planned 8 Nos. of Neighbourhoods and 6~8 blocks in one neighbourhood. So in total there will be approx 50 blocks in 24,000 Kanals.
What is the source of water required for Horticulterist?
Water required for Horticulterist is approx 0.7 MGD (million gallon per day), will be provided from the small dams already made by locals and are being kept as it is. Rain water will be collected and stored during moon-soon and winter rains in these dams. As per last 50 year rain data record collected from diff. Departments, we can get from our site and surrounding areas approx. 287 MG water in one season.
What is the source of portal water required for the socieity?
Potable water for housing and other areas will be provided through tube-wells to be installed at the lower side of dam Chahan and in river sill. We need about 60.8 MGD water for housing and related commercial areas when fully developed.
How many Overhead & Underground Water Tanks are planned for water storage?
We will require approx. 45 overhead tanks of 100,000/- gallons and approx. 150 underground tanks of 400,000/- gallon capacity each for storage.
What are payment modes for booking/installments ?
Payment can be made through following modes : PO/DD/Cheque : In Favour of “Future Development Holdings Private Limited” Inter Bank Funds Transfer : Account Title: FUTURE DEVELOPMENTS HOLDINGS Pvt Ltd Bank Name : United Bank LTD (UBL) IBAN Account No. : PK44UNIL0109000249074851 SWIFT Code : UNILPKKA Branch Code : 1233 —————————————– Account Title: FUTURE DEVELOPMENTS HOLDINGS PRIVATE LIMITED Bank Name : Askari Bank Limited (Islamic Banking Services) IBAN Account No. : PK33ASCM0007300200008247 Online Payment through Visa/Master Card : Member Portal after login proceed to pay online Downn Payments General Payments (Installments, charges/fees)